Fill EDF form free

EDF

EDF form generatorEDF guideEDF due datesEDF form by bank

Tools

EDF FormEDF Due Date Calculator₹10 Lakh Realisation DeclarationExport InvoiceGST InvoiceProforma InvoiceQuotationCredit / Debit NotePayment ReceiptSalary SlipLetterheadUPI QR CodeAmount in WordsGST CalculatorExport Value in INR CalculatorPurpose Code FinderSAC Code Finder

More

All calculatorsInvoice templatesSalary slip formatsBank lettersCover, HR & business lettersGuidesGlossary Log inCreate free account
  1. Home
  2. Guides
  3. Industry Guides
  4. EDF for Embedded Systems and VLSI Design Firms: Export Decl…
Industry Guides

EDF for Embedded Systems and VLSI Design Firms: Export Declaration Guide

Chip design, verification, firmware and board design done in India for overseas semiconductor and product companies is a service export, and from 1 October 2026 it is declared on the single EDF. Before anything else, sort your firmware, RTL, verification and layout work into "Software" and "Services" for field 1.1, because that sorting decides whether STPI is open to you as well as the bank. Design centres inside an SEZ skip that choice and file with the Development Commissioner. After that, it is a monthly list of invoices, with one wrinkle unique to hardware work: evaluation boards and samples that cross the border are goods, not services.

Five questions to answer before March's invoices go out

  1. Is your unit in an SEZ? If yes, every declaration goes to the SEZ Development Commissioner and the AD bank/STPI choice does not arise.
  2. Which streams are software? Firmware, drivers and board support packages usually are. RTL design, verification, DFT and physical design are arguable either way. Get your CA's view in writing.
  3. Where will software forms go? AD bank or STPI. Firms with an STPI registration for other reasons sometimes keep filing there; most find one authority (the bank where the money lands) simpler.
  4. What does each FIRA say? Agree the expected purpose code per stream with your bank before the first payment, not after.
  5. Do you ship anything physical? Boards, FPGA kits and engineering samples follow the goods process with your courier or forwarder and do not belong in Part 2B.

Streams, codes and the arguable cases

Semiconductor work produces more genuinely ambiguous code choices than almost any other export industry. The table is a starting point for the conversation with your CA and bank, not an answer.

Design-house stream Probable 1.1 tick Candidate SAC Candidate remittance code
Firmware, drivers, BSPs, embedded Linux Software 998314 P0807 (off-site software exports) or P0802
RTL design and micro-architecture Either; CA decides 998314 or 998331 (engineering advisory) P1009 (architectural, engineering and other technical)
Design verification, DFT, physical design Services or Software 998331 or 998393 Scientific and technical consulting services P1009
Post-silicon validation and characterisation in your lab Services 998346 Technical testing and analysis services P1009
Schematic and PCB layout Services 998331 P1009
Funded research on a client's next-generation architecture Services 998393 P1008 Research & development services
Hardware bring-up and integration support Services 998313 IT consulting and support services P0801 Hardware consultancy / implementation
Prototype boards and samples Goods HSN, not SAC Not on a services EDF

The cases worth a second look:

  • RTL is code, but is it software? Verilog and VHDL are written like software and delivered through version control, yet the output is a hardware design. Some firms treat RTL as engineering services (P1009); others treat it as software. Neither label is wrong in the abstract. What matters is that your invoice, Part 2B, the GST invoice and the FIRA agree.
  • P1008 vs P1009. Research implies the client is buying new knowledge; engineering implies it is buying a defined design deliverable. A tape-out-bound project is usually the latter, even when it feels like research.
  • P0807 vs P0802 for firmware. Offshore firmware delivered as code leans to off-site software exports; firmware engineers integrating at the client's lab lean to implementation. Firmware teams who split time between Bengaluru and a client's lab in Munich will find the line drawn in more detail in software consultancy vs off-site export codes.

AD bank, STPI or Development Commissioner

Location of the design centre Firmware and other software RTL, DV, layout and lab services (if treated as services)
DTA, no SEZ Bank, or STPI if you prefer Bank only
SEZ unit Development Commissioner Development Commissioner

SOFTEX has gone, and STPI certification is no longer mandatory; AD banks are now specified authorities on par with STPI. If your firm splits software to STPI and services to the bank, you are running two filing calendars every month. That is allowed, but it doubles the chance of a missed form.

How semiconductor contracts are billed, and what each does to the clock

NRE milestones. Specification freeze, RTL complete, verification sign-off, GDS hand-off, tape-out. Each milestone invoice is a Part 2B row on the form for the month of its date, and each starts its own nine-month realisation period. Start-up clients often pay milestones out of their next funding round, so a milestone invoiced just before a round slips is the classic overdue invoice in this industry.

Offshore development centres. A client funds a dedicated team at a per-engineer monthly rate. Predictable, one invoice a month. If the engineers work entirely under the client's direction and the contract reads like supply of people, your CA may consider contract staffing rather than design services for the SAC.

Tape-out and first-silicon bonuses. Contingent fees payable if the chip tapes out on schedule or works on first silicon. Do not invoice them in advance "to be safe": an unpaid contingent invoice would sit open and its nine-month clock would run while you wait for silicon. Invoice when the event happens.

IP core licences and royalties. Firms that license their own soft IP may receive an upfront licence fee and per-unit royalties reported quarterly. P0901 in the RBI list covers patents, copyrights and industrial processes, which sounds close; still, put the question of how royalty receipts are declared to your bank and CA before the first quarterly statement lands.

EDA tool costs. If the client supplies tool licences, there is nothing to declare. Buying simulator or synthesis seats yourself and recharging Tamarack-style clients turns into a recharge question, discussed in client reimbursements and the EDF.

Worked example: Anvaya Silicon Labs in March 2027

Anvaya Silicon Labs Pvt Ltd, a fictional design house in Hyderabad outside any SEZ, has three foreign clients. Its March 2027 invoices:

Sl. Client (recipient) Country Inv. no. Inv. date Currency Amount Work billed SAC used SOW / agreement
1 Tamarack Semiconductor Inc USA ASL/2627/061 05-03-2027 USD 36,000 DV milestone 3, coverage closure, PCIe subsystem 998331 NRE-TS-02, 11-08-2026
2 Tamarack Semiconductor Inc USA ASL/2627/064 31-03-2027 USD 22,400 ODC, 8 verification engineers, Mar 2027 998331 ODC-TS, 01-04-2026
3 Brenner Antriebstechnik GmbH Germany ASL/2627/066 26-03-2027 EUR 12,000 Motor-control ECU firmware, sprint 5 998314 SOW-BA-01, 09-10-2026

Anvaya's CA treats verification as engineering services and firmware as software, and its bank prefers one form per export type. So Anvaya prepares a Services form (rows 1 and 2) and a Software form (row 3), both with its AD bank, both due by 30 April 2027.

Converted for illustration at ₹84 per dollar and ₹91 per euro, the rows come to ₹30,24,000, ₹18,81,600 and ₹10,92,000. All three cross ₹10 lakh, so each EDPMS entry will close on the invoice, FIRA and matching instructions once paid; the periodic declaration route will not help this firm much.

Three other things happen that month:

  • Anvaya couriers two FPGA evaluation boards to Tamarack. They are goods, handled through the goods export process, and do not appear on either services form. Our explainer on services vs goods declarations sets out the difference.
  • Tamarack's contract is signed by its US parent, but its Taiwan subsidiary pays the ODC invoice. Anvaya fills fields 1.15–1.16 with the paying entity and its relationship, and keeps Tamarack's written payment instruction; the third-party payments guide lists what else helps.
  • Milestone 3 is accepted with a punch list. Tamarack agrees to pay in full once two coverage holes close. Anvaya diarises the nine-month date (5 December 2027) and a check at six months, so it can request an extension with reasons if the punch list drags.

Documents a design house should keep

  • Master agreement, NRE statements of work and ODC rate schedules
  • Milestone acceptance records: sign-off emails, coverage reports, GDS hand-off confirmation
  • Timesheets or headcount reports behind ODC invoices
  • Tape-out or first-silicon confirmation behind any bonus invoice
  • Royalty statements and licence agreements, if you license IP
  • Export invoices with LUT wording, plus any credit notes
  • FIRAs or bank advices with the purpose code checked against your agreed stream mapping
  • Courier and goods export papers for any boards shipped, kept separately from the services file
  • Each EDF with the authority's acknowledgement

Design services supplied to a foreign client are generally zero-rated where the Section 2(6) IGST conditions are met, and most firms export under an LUT. The acceptance records above are what show the service was rendered when a GST refund is examined. This guide describes general practice for design houses; it is not legal or tax advice, and stream classification in particular is your CA's call.

Frequently asked questions

Is VLSI design "Software" or "Services" on the EDF?

It depends on the deliverable and on how your CA and bank view it. Firmware is commonly treated as software, while RTL design, verification and physical design are often described as engineering services. Choose a classification per stream and apply it consistently.

Can an embedded firm still file software declarations with STPI?

Yes, for software exports from outside an SEZ. STPI and AD banks are both specified authorities, and STPI certification is no longer mandatory. Non-software services go to the AD bank, and SEZ units file with the Development Commissioner.

Do evaluation boards shipped to a client go on the services EDF?

No. Physical boards, kits and samples are goods and follow the goods export process. Only the design, verification and firmware services go on the services or software declaration.

When should a first-silicon bonus be invoiced?

When the triggering event happens. Invoicing a contingent fee early starts its nine-month realisation period before you know whether it will be paid, which can leave an open entry you cannot close.

Which purpose code fits design verification receipts?

Verification is often coded P1009, architectural, engineering and other technical services, though some banks may view it as software work. Agree the expected code with your bank before the first payment and correct any FIRA that comes in differently.

Before your next tape-out invoice

Map each stream to a type of export and a code pair, keep boards out of Part 2B, and invoice contingent fees only when earned. Both Services and Software forms can be built in the free EDF form generator.

This guide is general information for Indian businesses, not legal or tax advice. Rules and bank processes change — confirm specifics with your AD bank or chartered accountant.