Fill EDF form free

EDF

EDF form generatorEDF guideEDF due datesEDF form by bank

Tools

EDF FormEDF Due Date Calculator₹10 Lakh Realisation DeclarationExport InvoiceGST InvoiceProforma InvoiceQuotationCredit / Debit NotePayment ReceiptSalary SlipLetterheadUPI QR CodeAmount in WordsGST CalculatorExport Value in INR CalculatorPurpose Code FinderSAC Code Finder

More

All calculatorsInvoice templatesSalary slip formatsBank lettersCover, HR & business lettersGuidesGlossary Log inCreate free account
  1. Home
  2. Guides
  3. Industry Guides
  4. EDF for Engineering Design Services Firms: Export Declarati…
Industry Guides

EDF for Engineering Design Services Firms: Export Declaration Guide

Engineering design firms that bill overseas EPC contractors, plant owners and manufacturers declare that work on a monthly EDF lodged with their AD bank; the form for any month falls due 30 days after that month closes. The form itself is short. What makes it awkward for an engineering office is the way design work is contracted: man-hour rates against a purchase order, fixed fees per drawing package, variation orders raised months after the original scope, and EPC clients who pay only after their own client certifies progress.

At a glance Typical answer for a design office in India
Type of export (1.1) Services
Delivery mode (1.4) Internet for office-based design; Others for work done mainly at a site abroad
Likely purpose code P1009 — Architectural, engineering and other technical services (bank confirms)
Likely SAC code 998331 — Engineering advisory services, or a neighbouring code your CA picks
Biggest practical risk An invoice held up in a certification chain running past its 9-month date

How engineering design contracts are usually written

Most overseas engagements for an Indian design office fall into one of four shapes, and each shape decides when invoices are raised and therefore which EDF they land on.

Man-hour contracts against a call-off order. The client issues a frame agreement with agreed hourly rates per grade (lead engineer, senior designer, CAD draughtsperson) and then call-off orders per project. You bill monthly against approved timesheets. One client can generate several invoices a month if each call-off has its own PO, and each of those invoices is a separate Part 2B row.

Lump-sum packages with milestone payments. A fixed fee for, say, the structural steel design of a pipe rack, paid in stages: a percentage on issue for review (IFR), more on issue for construction (IFC), the balance on as-built drawings. Each stage invoice is raised only when the client accepts the stage, and that acceptance date is often weeks after your team finished. The EDF follows your invoice date, not the engineering progress.

Variation orders. Clients change pressure ratings, swap equipment vendors or add a tie-in. Extra scope is priced as a variation and billed on its own invoice, sometimes long after the parent package closed. Give the variation invoice its own row and reference both the variation number and the original PO in the contract column.

Embedded design teams. Some clients ask for a fixed team of named engineers working on their standards and software, billed per person per month. This looks like staffing, and it raises a classification question covered below.

Codes for engineering receipts and the grey zones

The purpose code is reported by the bank on each inward remittance. Detailed engineering and design review sit most comfortably under P1009 (Architectural, engineering and other technical services). Your SAC choice appears twice, on the GST invoice and in the Part 2B row; for a design office the realistic shortlist looks like this:

Work you deliver SAC candidates (confirm with CA) Purpose code (confirm with bank)
Detailed engineering, design calculations, design review 998331 Engineering advisory services P1009
Feasibility, technical due diligence, process studies 998393 Scientific and technical consulting services P1009
Product or industrial design for a manufacturer 998391 Specialty design services (interior, fashion, industrial, graphic design) P1009
Stress testing, simulation reports, material analysis 998346 Technical testing and analysis services P1009
Engineering software customised and delivered to the client 998314 IT design and development services P0802 Software consultancy / implementation
Named engineers placed under the client's direction 998513 Contract staffing services Discuss with bank

Three cases cause most of the back-and-forth:

  • Plugins and automation scripts. If your team writes a CAD automation tool or a design-rule checker and sells it as a deliverable, the client is buying software, not engineering. P0802 and 998314 may describe it better than P1009. If the script is incidental to a drawing package, it stays inside the engineering invoice.
  • Embedded teams. A team billed per head per month and directed by the client's lead engineer may look like contract staffing to your CA. A team that owns deliverables and quality under your own checker-approver system looks like engineering services. The contract wording matters, so read it before picking codes.
  • Site work. Surveys, HAZOP participation and commissioning support delivered at the client's plant abroad still go on the EDF, but with "Others" in field 1.4 and a Part 2B description that says where and for how long. Place-of-supply rules for site-based services are a GST question for your CA.

Whatever you settle on, make the GST invoice, Part 2B and the FIRA tell the same story. When a FIRA for a piping package comes back tagged as something unrelated, get it fixed through a purpose code correction letter before the mismatch reaches your GST refund file.

Worked example: Kalinga Process Design in March 2027

Kalinga Process Design Pvt Ltd is a fictional 40-person detailed-engineering office in Bhubaneswar. In March 2027 it raised the invoices below. The rupee figures use illustrative book rates (AED ₹23, EUR ₹91, USD ₹84) only to show the arithmetic.

Sr. Recipient, country Invoice ref / dated Currency, amount Work billed SAC PO or agreement Remarks
1 Al Noor Industrial Contracting LLC, UAE KPD/26-27/118, 02-03-2027 AED 52,000 Piping design man-hours, February, call-off CO-14 998331 FA-2025-07, 10-07-2025 Timesheets approved 28-02
2 Al Noor Industrial Contracting LLC, UAE KPD/26-27/119, 02-03-2027 AED 9,800 Variation VO-03: added tie-ins, Unit 200 998331 FA-2025-07 / VO-03 Paid by parent, Oman
3 Westerholt Chemie GmbH, Germany KPD/26-27/120, 15-03-2027 EUR 14,500 Structural package SP-2, IFC stage 998331 SA-4471, 03-11-2026 Advance EUR 3,000 adjusted
4 Brightwater Pumps Inc., USA KPD/26-27/121, 27-03-2027 USD 6,200 Pump casing redesign and FEA report 998346 PO 88231, 12-02-2027

The month's total is roughly ₹11,96,000 + ₹2,25,400 + ₹13,19,500 + ₹5,20,800, which is ₹32,61,700. The EDF for March 2027 is due on 30 April 2027.

A few things in that table come straight from engineering practice:

  • Row 1 is for February's hours but dated 2 March, so it sits on the March form. Firms that date man-hour invoices on the last day of the month instead pull them into the earlier EDF; either is fine, but be consistent so your register is predictable.
  • Row 2 is paid by the contractor's parent in Oman rather than the UAE entity that signed the call-off. That is a third-party payment: fill fields 1.15 and 1.16 with the payer and the relationship, and keep the client's letter instructing the parent to pay. For the wider rules, see when someone else pays for your client.
  • Row 3 had a EUR 3,000 mobilisation advance received in December. Note it in remarks so the bank can match the earlier receipt against this invoice. Mobilisation advances that sit unbilled for a long time need a conversation with the bank; declaring services before or after the money arrives sets out the choices.
  • Row 4 is testing and analysis rather than design, hence the different SAC.

Rows 1 and 3 exceed ₹10 lakh, so their EDPMS entries close only with the invoice, payment evidence and matching instructions. Rows 2 and 4 are small enough to be closed on Kalinga's periodic realisation declaration, if its bank accepts that route.

If Kalinga banks with HDFC, each receipt also needs the bank's own EDF request letter (Attachment 3A), which for P1009 is the only mandatory document on HDFC's checklist. On each receipt's HDFC request letter, Kalinga lists the invoice or invoices that remittance settles, and for the Oman payment it answers yes to the third-party question.

Certification chains and the 9-month clock

An engineering subcontractor is usually two or three levels below the money. The plant owner certifies the EPC contractor's progress, the contractor approves your invoice in its system, and payment runs on its cycle. Realisation for services must be complete within 9 months from the invoice date (12 months where invoiced and settled in rupees). The AD bank can extend that period on a reasoned request.

Practical habits that keep a design office inside the window:

  • Don't invoice before acceptance unless the contract allows it. An IFC invoice raised before the client signs off the transmittal starts the 9-month clock while the client still treats the stage as open.
  • Track retention separately. If the client withholds a percentage until as-built drawings, invoice the retention when it becomes due rather than inside the stage invoice. Otherwise the retained amount sits unrealised against an old invoice date.
  • Record partial payments. When a client pays a stage invoice short pending comments, note the shortfall and the reason. If you agree a reduction, issue a credit note and tell the bank, so the realisable value on the EDPMS entry reflects what you will actually receive.
  • Ask early. At around month six on any invoice still unpaid, write to the client and keep the reply. If realisation by month nine looks unlikely, send the bank an extension request with that correspondence attached.

Documents an engineering office should keep per invoice

Banks ask for different things, and GST refund officers ask for others. A file per invoice that holds the following answers both:

  1. The frame agreement or service agreement, plus the PO or call-off number on the invoice.
  2. Approved timesheets (man-hour work) or the signed transmittal and client acceptance (package work).
  3. Variation orders with the client's written approval.
  4. The FIRA or bank advice for each receipt, with the purpose code checked.
  5. A copy of the monthly EDF and the bank's acknowledgement.
  6. The LUT acknowledgement for the financial year, since engineering invoices to foreign clients are normally raised without IGST under LUT, carrying the wording "Supply meant for export under LUT without payment of IGST".
  7. Travel records and site reports for any on-site work abroad.

That last item matters because the on-site rows are the ones most likely to be questioned, both for the delivery mode on the EDF and for the zero-rating conditions under Section 2(6) of the IGST Act.

Nothing here is legal or tax advice for your firm; treat it as general information and settle the code and place-of-supply calls with your CA.

Frequently asked questions

Should CAD drawings and 3D models sent by file transfer be shown as Internet delivery?

Yes. Drawings, models and calculation reports sent electronically are delivered over the Internet, which is one of the options in field 1.4. Use "Others" for a row where the service was delivered mainly in person at a site outside India, and describe the site work in Part 2B.

Is P1009 always the purpose code for engineering design receipts?

P1009 covers architectural, engineering and other technical services, so it fits most design and detailed-engineering receipts. If you sell a software tool as the deliverable, the bank may consider P0802 more accurate. The bank reports the code on each remittance, so tell it what you deliver and check every FIRA.

How do we show a variation order on the EDF?

Raise the variation on its own invoice and give it its own row in Part 2B, in the month the invoice is dated. In the contract column, quote both the original agreement or PO and the variation number, so anyone reading the form can trace it back to the base scope.

The EPC contractor's head office pays our invoices. Is that a problem?

It is common and workable. Fill the third-party fields (1.15 and 1.16) with the payer's name and its relationship to your client, and keep the client's written instruction for the payment. Ask your bank whether it wants anything further for that remittance.

Our client holds back retention until as-built drawings. How does that affect realisation?

Retention held inside an invoice stays unrealised against that invoice's date, which can push it toward the 9-month limit. Many firms invoice the retention separately when it becomes payable. If an older invoice still carries unpaid retention near the deadline, request an extension from your AD bank with the contract clause and correspondence.

Before the next drawing package goes out

Settle your codes once per contract type, date invoices consistently, and keep acceptance records next to each invoice. Then build the monthly declaration in the free EDF form generator and check any doubtful classification in the SAC code finder.

This guide is general information for Indian businesses, not legal or tax advice. Rules and bank processes change — confirm specifics with your AD bank or chartered accountant.